Burnbrae Distillery, Campbell Meyer & Co Ltd
As Part of ongoing works at Campbell Meyer & Co Ltd, East Kilbride A10 Architects have been appointed to submit a change of use planning application for the formation of a new Distillery housed in the existing main building.
Currently the existing building is being used as storage / maturation and covered by the storage of Hazardous Substance approval, we were also instructed with submitting a variation to the existing Hazardous Substance approval to cover the part change of use to a Whisky Distillery.
We successfully obtained planning and building warrant approval for the project and works are currently ongoing with Burnbrae Distillery and due to be completed in 2020
![Burnbrae Distillery Campbell Meyer](https://i0.wp.com/www.a10architects.com/wp-content/uploads/2017/06/AL4002-Rev-C-PROPOSED-ELEVATIONS-COLOUR-a-e1498052633312-768x472.jpg?resize=768%2C472&ssl=1)
![Burnbrae Distillery Campbell Meyer](https://i0.wp.com/www.a10architects.com/wp-content/uploads/2017/06/AL4002-Rev-C-PROPOSED-ELEVATIONS-COLOUR-a-1.jpg?resize=768%2C205&ssl=1)